Homebrew How to change order of hombrew?

Returnofganon

I pretend like I know what I'm talking about
OP
Member
Joined
Jul 1, 2015
Messages
537
Trophies
0
XP
454
Country
United States
Hey semi-noob here with hombrew. As the title states I want to change the order of the hombrew apps that I have on my hombrew channel. I couldn't find any threads talking about it so I'm going to create one. (If this is a dumb question just tell me) Tanks in advance!
 

Returnofganon

I pretend like I know what I'm talking about
OP
Member
Joined
Jul 1, 2015
Messages
537
Trophies
0
XP
454
Country
United States
Try going onto your SD card and change the sorting order by date or time.
Ok Ill try that in a minute. I'm doing some hex editing rn

--------------------- MERGED ---------------------------

Try going onto your SD card and change the sorting order by date or time.

Well on my sd card the apps are in alphabetical order, but they are in seemingly a random order when I open up Ironhax
 

The Real Jdbye

*is birb*
Member
Joined
Mar 17, 2010
Messages
23,398
Trophies
4
Location
Space
XP
14,045
Country
Norway
Ok Ill try that in a minute. I'm doing some hex editing rn

--------------------- MERGED ---------------------------



Well on my sd card the apps are in alphabetical order, but they are in seemingly a random order when I open up Ironhax
Maybe they are in the order they were added to the card? In that case you could use a FAT sorter application to manually or automatically sort the entries.
 

WeedZ

Possibly an Enlightened Being
Global Moderator
Joined
Jan 13, 2015
Messages
3,825
Trophies
1
Location
The State of Denial
Website
gbatemp.net
XP
5,666
Country
United States
Try going onto your SD card and change the sorting order by date or time.
Lol wut?

Also, @Returnofganon , as everyone has said, I believe it is in order by timestamp of when it was added to the sd. Just copy everything from the 3ds folder to your pc and copy them back, one at a time, in the order you want them.

I wouldn't use any fat sorter as I don't think it discriminates by directory. Meaning it will break the signiture for your 3ds data on the sd
 

Krude

Well-Known Member
Member
Joined
May 18, 2013
Messages
344
Trophies
0
XP
1,208
Country
Gambia, The
I thought it was Date Added, too, but the last homebrew i added is svdt and itshows up in the middle of the list...
 
  • Like
Reactions: 730

HaloEffect17

Hiya!
Member
Joined
Jul 1, 2015
Messages
1,321
Trophies
1
XP
2,736
Country
Canada
Just copy everything from the 3ds folder to your pc and copy them back, one at a time, in the order you want them.
Yep, that would be the way to go. I couldn't discover any other method that would remedy this. Too bad you can just hold down an app in Homebrew Launcher and move it to another spot in the menu akin to what phone menus normally do. It would make things a whole lot easier.
 

suloku

Well-Known Member
Member
Joined
Apr 28, 2008
Messages
883
Trophies
1
XP
877
Country
I've modified the homebrew lacuncher to sort by folder name. I love open source. I'll send the code github, see if it can be added.
I'll try to make it sort by Title though, seems cleaner than folder name and a smdh editor has just popped out.

UPDATE: attached boot.3dsx that sorts per filename. It uses the latest source at github, so there should be no problems.

UPDATE2: been using it for a while and everything is fine (well, there should be no reason for it to not).

I'm working on multi-directory for hbl since it seems easy to add, I can get rid of my pseudo-folders :D

UPDATE 3: https://gbatemp.net/threads/homebrew-launcher-with-sorting-and-folder-support.396793/
 

Attachments

  • hbl_sort.zip
    207.1 KB · Views: 197
Last edited by suloku,

Returnofganon

I pretend like I know what I'm talking about
OP
Member
Joined
Jul 1, 2015
Messages
537
Trophies
0
XP
454
Country
United States
I've modified the homebrew lacuncher to sort by folder name. I love open source. I'll send the code github, see if it can be added.
I'll try to make it sort by Title though, seems cleaner than folder name and a smdh editor has just popped out.

UPDATE: attached boot.3dsx that sorts per filename. It uses the latest source at github, so there should be no problems.

UPDATE2: been using it for a while and everything is fine (well, there should be no reason for it to not).

I'm working on multi-directory for hbl since it seems easy to add, I can get rid of my pseudo-folders :D

:bow: Thank you!
 

The Real Jdbye

*is birb*
Member
Joined
Mar 17, 2010
Messages
23,398
Trophies
4
Location
Space
XP
14,045
Country
Norway
Lol wut?

Also, @Returnofganon , as everyone has said, I believe it is in order by timestamp of when it was added to the sd. Just copy everything from the 3ds folder to your pc and copy them back, one at a time, in the order you want them.

I wouldn't use any fat sorter as I don't think it discriminates by directory. Meaning it will break the signiture for your 3ds data on the sd
The one I use to sort games on my Gateway can sort individual folders and you can even set the order of files manually. But sorting the entire drive would not harm anything either, the 3DS doesn't care what order the files are in the file allocation table, why would it? If it was that picky then all the 3DS content would stop working every time you copy stuff off and back on the SD card or move the files to another SD card and it would be impossible to fix :P

Not that it matters that much anymore since soluku posted a modified homebrew launcher, but here is the link anyway, for those who are unwilling to use a modded homebrew launcher, or those who want full control of the order their homebrew appears in to for example make the favorite homebrew appear at the top: http://www.anerty.net/software/file/DriveSort.php
 

Site & Scene News

Popular threads in this forum

General chit-chat
Help Users
    BigOnYa @ BigOnYa: You hater.